Whether it’s a residential or commercial asphalt work, the fact remains the same that they need a good amount of time before they could become usable once again.
The problem is that most of the times, people have no idea about how much time would be needed and this is what we have tried to discuss here in this post.
According to the experts, there are a number of things to take into consideration before we could assume the right amount of time needed by residential and commercial asphalt repair to become usable all over again.
Some of them are –
- The Type Of Asphalt Repair
- The Ground Temperature
- The Air Temperature
- The Size Of The Rollers Used
What Happens During Asphalt Curing?
- According to the expert of commercial asphalting services, the process of curing generally involves the asphalt oil and here, it is important to know that asphalt, when first laid is black in colour.
- Then, as the time passes, it starts changing its colour from black to grey and this happens because the oil present in the asphalt dries away in the sun and the process is called, "oxidation".
- Experts of commercial asphalting Sydney companies say that oxidation is actually a good thing as new asphalt has too much oil in it when first placed.
- One the asphalt has been laid in commercial asphalt work; experts say that you need to wait for at least a month before you could start sealing the parking lot area.
- This duration between repair work and sealing could extend to 90 days or 3 months in can of the residential driveway and experts say that sealing should be avoided until the asphalt is hard enough to withstand power steering.
- Sealing new asphalt will stop the oxidation process and cause the pavement to retain too much of its asphalt oils.